Quick answer

What is the difference between a shell test and a seat test?

A shell test assesses the valve's pressure-retaining boundary. A seat or closure test assesses leakage through the closed valve under defined conditions. They answer different questions: a buyer should review both results where both tests are required, rather than accepting a single statement that the valve was pressure tested.

Updated: — Added links to the metal-seated and soft-seated floating ball valve series in the seat-test acceptance discussion; model specifications unchanged.

KEHUA VALVE procurement guidance, not a pressure-test procedure or a product performance certificate. Testing must be planned and performed by qualified personnel under an approved procedure and safety controls. Public references explain principles; confirm the contract edition and the offered model's inspection scope. No universal test pressures or leakage limits are specified here.

Shell test and seat test: two different acceptance questions
Review pointShell / pressure-boundary testSeat / closure leakage test
Main questionDoes the pressure-retaining boundary meet the specified integrity test?Does leakage through the closed valve meet the specified acceptance limit?
What to identifyPressure-retaining assembly and the approved test scopeClosure arrangement, seat construction and required test direction
What the buyer needsSpecified medium, pressure, duration, observations and resultSpecified conditions, leakage measurement, limit and result
Do not inferA successful shell result is not evidence of the seat leakage resultA successful closure result does not replace the shell test record

Technical references and their scope

Emerson's inspection overview describes hydrostatic testing of pressure-retaining parts such as bodies and bonnets. ISO 5208's public scope separately identifies pressure-boundary integrity and closure tightness. Use those distinctions to organize the document review, not to copy another manufacturer's procedure or claim its results for a KEHUA model.

Specify the applicable standard and edition

API 598 and ISO 5208 are references buyers may encounter in industrial valve inspection requirements. Do not assume a standard applies to every valve or that two standards have identical test requirements. The API source-inspection guide expressly tells inspectors to confirm the purchase-order requirements; its 2015 guidance is background, not a substitute for the contract's current controlled standard.

Ask the supplier to identify the governing product standard, inspection and test standard, edition, project amendments and any proposed deviations. Resolve conflicts before purchase. For a valve offered to a pipeline specification such as API 6D, request its applicable testing scope instead of automatically replacing it with API 598.

Define the acceptance conditions, not just 'zero leakage'

A purchasing requirement should identify the test, medium, pressure, duration, temperature where relevant, leakage limit, units and observation or measurement method. Ask for the exact clause or approved project requirement supporting each acceptance criterion. Keep shell leakage observations separate from closure leakage measurements. For a ball valve enquiry, compare the metal-seated floating ball valve with the soft-seated floating ball valve as separate proposals. Ask the supplier to confirm the offered seat materials, test direction and leakage acceptance for each model; neither series name alone defines the acceptance limit.

Do not accept 'zero leakage', 'bubble-tight' or 'tested to standard' as a complete technical specification without the test boundary. Ask which seat arrangement and direction were evaluated, what limit was used and how the result was recorded. Avoid converting a factory acceptance statement into a lifetime or all-service-condition guarantee.

Match the test report to the delivered valve

Create a line-item review sheet that links the purchase-order item, valve identification, offered model, size, pressure designation, materials and approved drawing revision. The buyer's goal is to establish which supplied valve or documented batch the record covers; a photograph of a gauge cannot establish this relationship by itself.

Agree the required report contents before production. The checklist below is a proposed procurement format, not a declaration that every field is mandatory under every standard.

  • Valve tag or serial/batch identifier and purchase-order line item.
  • Governing test standard and edition, procedure number and revision.
  • Separate shell and closure test entries, with applicable directions identified.
  • Recorded medium, pressure, duration and relevant test temperature, with units.
  • Observed result or measured leakage, acceptance limit and pass/fail conclusion.
  • Test date, responsible sign-off and witness identification when contractually required.
  • Instrument identification and calibration evidence required by the approved inspection plan.
  • Deviations, corrective actions and retest records, linked to the final accepted revision.

Keep routine pressure testing separate from other qualification

Treat each required evidence item as a separate line in the inspection and test plan. A routine shell or closure record should not be used to imply that fire, fugitive-emission, cryogenic, endurance or other project-specific qualification has also been completed. Ask for the applicable record and scope whenever the project requires those claims.

Likewise, a management-system certificate does not identify the test result for the delivered valve. Request the documents relevant to the offered model and the actual order, and compare them with the contract's acceptance matrix.

Use a fill-in test requirement with the RFQ

Use the following template to open the technical discussion. Leave unconfirmed items marked 'to be agreed'; do not choose a pressure, medium or acceptance rate from a generic web table. The supplier and responsible project engineer should return an agreed inspection plan before production.

  • Valve family / model / quantity: ___; PO or enquiry item: ___.
  • Service medium / composition: ___; operating and design pressure / temperature with units: ___.
  • Size / pressure designation / material / end connection / seat arrangement: ___.
  • Product standard / test standard / edition / project amendments: ___.
  • Required shell and closure tests / directions / acceptance clauses: ___.
  • Required test records / traceability / witness or hold points / retest approval: ___.
  • Additional qualification or inspection requirements and their evidence: ___.

Request model-specific inspection information from KEHUA

Start with the relevant KEHUA valve family and identify the exact series, construction and intended duty. Send the service data, requested standard and document checklist with the enquiry so the proposed inspection scope can be reviewed. This article does not establish an inspection rating, leakage class or qualification for every product in the catalogue.

Compare valve families

Use this guide together with the relevant valve family and project operating data.

Primary technical references

Confirm the edition required by the contract. The project specification and purchased standard remain controlling.