CERTIFICATES & COMPLIANCE

Industrial valve certificates and quality documents

Review Kehua's API 6D authorization, ISO management-system certificates and product records for industrial valve supplier qualification.

CERTIFICATES & COMPLIANCE

Evidence for a technical review

Use the certificate number, scope and validity shown on each record when your procurement or inspection team reviews a project package. Request the documents needed for project qualification, inspection planning and traceability before technical approval.

Request the quality file
Standards and scope are stated on the supplied certificate record.
Product-level evidence is kept separate from management-system certificates.
Send your project standard and inspection requirements with the RFQ.
API 6D Authorization
01Preview only

API 6D Authorization

License 6D-2247 · Ball, check, gate and plug valves

ISO 9001 Quality Management
02Preview only

ISO 9001 Quality Management

Certificate 65626Q00446R010 · valid to Feb 2029

ISO 14001 Environmental Management
03Preview only

ISO 14001 Environmental Management

Certificate 104726E00029R000 · valid to May 2029

ISO 45001 Occupational Health & Safety
04Preview only

ISO 45001 Occupational Health & Safety

Certificate 104726S00028R000 · valid to May 2029

Special Equipment Production License
05Preview only

Special Equipment Production License

Pressure pipeline metal valve manufacturing · Class B

RoHS Ball Valve Compliance
06Preview only

RoHS Ball Valve Compliance

Certificate TST26231200668CC · listed ball valve models

Utility Model Patent
07Preview only

Utility Model Patent

Three-piece stainless steel threaded ball valve · ZL 2019 2 1729918.4

Can a company certificate replace an order-specific test report?

A company or management-system certificate is not the test result for a delivered valve. Review inspection scope, acceptance conditions, report identification and traceability against the contract and proposed model; a certificate preview does not replace verification of current status and scope.

Review shell and seat test evidence

SUPPLIER QUALIFICATION CHECKLIST

What should buyers check before technical approval?

Check who manufactured the valve, what each certificate covers, and which records apply to the proposed model and order. The previews above support an initial review; they do not replace current issuer verification or project-specific technical approval.

Manufacturer qualification

  1. 1. Match the legal entity and manufacturing location

    Compare the supplier name and manufacturing address on the quotation with the documents supplied. This website identifies the company as Wenzhou Kehua Valve Co., Ltd.; ask for clarification where a record uses a different name or location.

  2. 2. Verify the certificate number, status and scope

    Read the issue and expiry information, issuing body and covered activities. Check current status with the issuer or official directory. A preview or printed expiry date alone is not proof that a certificate is currently active or covers the valve you intend to buy.

  3. 3. Distinguish management systems from product evidence

    ISO management-system certificates are not individual valve test reports, and ISO itself does not issue certificates. Check API authorization scope against the required valve family; do not extend a listed scope to every product on the website.

Model and order documents

  1. 1. Confirm the proposed model and technical configuration

    Request the model datasheet, drawing and material schedule needed for your review. Reconcile size, pressure–temperature limits, body and seat materials, end connections and actuation against the project specification.

  2. 2. Agree inspection and acceptance requirements

    State the applicable test standard, acceptance criteria and any additional testing, witnessing or third-party inspection in the RFQ. Confirm their inclusion in the quotation; a general supplier certificate does not demonstrate that a particular valve passed an order-specific test.

  3. 3. Define traceability and the delivery document list

    Specify the material, heat or serial-number traceability and inspection reports your contract requires. Agree the document list and review stages before placing the order, rather than assuming every record is included with every product.

Verification references: API Composite List for API license and registration status; ISO certification guidance for the role of external certification bodies. These links explain verification methods; they are not a claim that every KEHUA record has been independently revalidated here.

Original certificate documents remain unavailable for public download. Contact us to request the relevant records for your review.