Updated: — Added the metal-seated floating series to the bore comparison and clarified model-drawing checks; no bore or pigging approvals added.
In this guide
- What is the difference between full bore and reduced bore ball valves?
- When does a pipeline need a full bore valve?
- Can a reduced bore valve work in a pipeline?
- How does bore size affect pressure drop?
- Is full bore always better for flow?
- Does bore size determine valve pressure rating?
- What does API 6D tell a buyer about the bore?
- Will a reduced bore valve save money or space?
- Which drawings and documents should a supplier provide?
- What information belongs in a ball valve bore RFQ?
- How should buyers compare full and reduced bore quotations?
- Compare bore and ball support separately
- Buyer answers: full bore, reduced bore and pigging
| Buying question | Full bore / full port | Reduced bore / reduced port |
|---|---|---|
| Flow opening | Intended to provide an opening approximately matching the adjoining pipe bore; verify the specified minimum opening. | The opening is smaller than the adjoining pipe bore; specify its actual dimension. |
| Pigging | A candidate where a continuous passage is required, subject to the pig and piping specification. | Usually unsuitable for a through-passing pig unless the project explicitly confirms compatibility. |
| Hydraulic review | Often preferred where avoiding an unnecessary local restriction matters. | Include the valve loss in the line calculation before accepting a smaller opening. |
| Envelope and cost | May require a larger ball, body or actuator for the same line size. | May reduce size or cost in some designs; request project-specific quotations. |
| Purchase evidence | Require a dimensioned drawing of the minimum passage. | Require the same drawing plus the proposed bore and loss data. |
What is the difference between full bore and reduced bore ball valves?
A full bore ball valve has a flow opening intended to be approximately the same size as the adjoining pipeline bore. A reduced bore ball valve has a smaller opening through the ball. Both are quarter-turn isolation valves. The bore choice changes the available passage and the local flow restriction; it does not by itself determine pressure class, shutoff quality or whether the valve meets the entire project specification.
Buyers should define the required minimum opening rather than relying on the words full port or reduced port alone. Pipe wall thickness, end connections and the specified standard can affect the dimensions used for comparison. Ask for a dimensioned drawing of the smallest clear passage through the offered valve, then compare that dimension with the piping and operating requirements.
When does a pipeline need a full bore valve?
A full bore valve is usually shortlisted when the line must pass an inspection or cleaning pig, or where an avoidable restriction would conflict with the project's hydraulic design. It can also simplify discussions about internal clearance across the valve station. SLB describes full port designs as a useful option where pigging may be necessary, while distinguishing them from reduced port openings.
Full bore is still a starting description, not a piggability certificate. The pig type, its sealing elements, minimum passage, bends, reducers, weld roots and other equipment along the entire route must be checked. A full bore valve can sit inside a line that is unsuitable for the selected pig for reasons outside the valve. Record the pig's dimensional and operating requirements in the RFQ and request a confirmed valve bore drawing.
Can a reduced bore valve work in a pipeline?
A reduced bore valve can be appropriate when the line does not require a through-passing pig and the additional local restriction is acceptable to the process engineer. The valve may offer a smaller package or a commercial advantage in some configurations, but neither outcome is guaranteed. The correct decision depends on the offered model, line size, operating profile and lifecycle cost.
Do not treat a nominal reduction of one pipe size as a universal engineering rule. Suppliers may describe reduced openings differently, and a drawing is needed to establish the actual internal diameter. Check any downstream equipment sensitive to velocity, turbulence or pressure loss. If the system is already near a hydraulic limit, obtain the valve's relevant flow data before assuming that a smaller bore is harmless.
How does bore size affect pressure drop?
Reducing the valve opening changes the local flow path and can increase resistance compared with an otherwise comparable full bore design. SLB notes that reduced port ball valves generally produce higher energy losses. The magnitude in a real installation depends on the fluid, flow rate, pressure, temperature, bore geometry and the surrounding piping; a generic percentage is not reliable enough for a purchase decision.
For a controlled comparison, ask suppliers for the same type of flow coefficient or pressure-loss information for each proposed size and configuration. Give the process engineer both offers and the line's normal, minimum and maximum flow cases. Include transient or upset cases where relevant. Hydraulic approval should use the project calculation, not the product category label or a simplified marketing chart.
Is full bore always better for flow?
A less restricted passage can be valuable, but full bore is not automatically the best total-project choice. If there is no pigging requirement and the calculated loss of the reduced opening is acceptable, the smaller configuration may deserve a commercial comparison. Materials, seat design, actuator sizing, delivery and inspection scope still need to be equal before prices are compared.
A purchasing decision based only on the bore can miss other restrictions, such as a pipe reducer or an adjacent instrument connection. Evaluate the complete flow path. Conversely, accepting reduced bore merely to lower the initial quote can create recurring energy loss or prevent a planned inspection method. State the operating reason for the selected bore in the approved valve datasheet.
Does bore size determine valve pressure rating?
No. The flow opening and the pressure-temperature rating answer different questions. The rating depends on the complete valve design, body and end connections, materials and the governing standard. ASME B16.34 addresses pressure-temperature ratings and other construction requirements for relevant valve designs. A full bore valve is not inherently a higher pressure valve, and a reduced bore valve is not inherently a lower pressure valve.
Specify design pressure and temperature separately from nominal size and required bore. Confirm the class and rating basis of the exact proposed valve. Where the fluid is corrosive, abrasive, hot or cold, the body, trim, seats and seals must be reviewed together. The allowable differential pressure for operation and actuator torque are separate checks that should also appear in the technical offer.
What does API 6D tell a buyer about the bore?
API Specification 6D is an important reference for pipeline and piping valve procurement within its defined scope. API has published a 25th edition and later addenda and errata, so buyers should state the edition and amendments required by their contract. The standard reference does not replace a project-specific minimum passage, pigging requirement, drawing or supplier deviation list.
Ask the supplier to identify the offered valve model and the applicable standard, then confirm the proposed opening from its current drawing. Do not copy dimensions from an old catalog into a new project without checking the contract edition and line data. If the project calls for additional tests, special materials, fire qualification or a particular inspection witness point, record those separately in the purchase specification.
Will a reduced bore valve save money or space?
A smaller opening may permit a more compact ball or body in some designs, which can affect mass, actuator torque and quoted price. The result varies by manufacturer and configuration. A smaller valve may still need a larger actuator for a difficult operating condition, or it may require an end connection that changes the installed length. Obtain both general arrangement drawings before treating any saving as certain.
Compare total installed cost where the difference matters: valve, actuator, supports, transport, installation, inspection, energy use and maintenance access. For a continuously operating line, the value of lower flow resistance may exceed a modest purchase-price saving. For an infrequently used service with generous hydraulic margin, a reduced bore alternative may be reasonable if engineering approves it.
Which drawings and documents should a supplier provide?
A quotation should identify the nominal line size, offered valve size, pressure class, end connection and the minimum clear bore. Request a general arrangement drawing that shows the opening and key interface dimensions. For a piggable line, ask for explicit confirmation against the project pig specification. A generic claim of full port is insufficient if no actual passage dimension is supplied.
Also request the applicable data sheet, material schedule, test and inspection scope, actuator details if fitted, and a marked list of deviations. If the offer uses a different bore from the RFQ, require that exception to be visible before technical evaluation. Keep the approved drawing and final datasheet with the purchase order so manufacturing and receipt checks use the same basis.
What information belongs in a ball valve bore RFQ?
A clear RFQ helps suppliers price comparable valves and identify missing technical decisions before production. Provide the operating conditions and line details in a shared datasheet, then ask each supplier to answer against the same requirements. The bore requirement should be measurable and connected to the project's reason for choosing it.
- Line details: nominal pipe size, pipe schedule or actual internal diameter, piping class and end connections.
- Bore: full or reduced opening, required minimum clear diameter and whether pig passage is required.
- Pigging data, when relevant: pig type, minimum passage and any project-specific inspection limits.
- Process conditions: fluid composition, flow range, design pressure and temperature, and any solids or corrosion concerns.
- Valve configuration: body material, seats, ball construction, actuation and required sealing direction.
- Documentation: contract standards and editions, drawings, test records, inspection points and traceability requirements.
- Commercial scope: quantity by line item, delivery destination, required date and requested spares.
How should buyers compare full and reduced bore quotations?
Put the two technical offers into one comparison sheet. Check actual bore dimension, drawing revision, rating, materials, seat arrangement, actuator scope, tests and documents. Then record the hydraulic and pigging decision made by the project engineer. Only after those differences are resolved should the team compare price and delivery. This avoids accepting an apparently cheaper valve whose passage is smaller than the approved specification.
When a supplier proposes a reduced bore alternative, require a clearly identified deviation with the actual opening and supporting loss data. If the project can accept it, update the approved datasheet so the order, inspection and operating teams share the decision. If the line must remain piggable, retain a bore requirement supported by the pigging plan and verify every in-line component against it.
Compare bore and ball support separately
Full or reduced bore describes the flow opening; floating or trunnion-mounted describes how the ball is supported. Compare the relevant KEHUA series below, then specify the minimum clear passage separately in the RFQ. A series link does not confirm full bore, piggability or the dimensions of an offered model; obtain its datasheet and drawing before approval.
Buyer answers: full bore, reduced bore and pigging
Is a full bore ball valve automatically piggable? No. Full bore describes the valve passage, while piggability depends on the pig and the whole pipeline. Confirm minimum opening and the other in-line components before approving the route.
Can a reduced bore valve be used for oil and gas service? It may be suitable if the applicable standard, process calculation and project specification permit it. State the offered bore and any restriction in the technical offer; do not assume reduced bore is prohibited in every pipeline duty.
Can a valve be full bore and trunnion-mounted? Yes. Ball support and flow-opening size describe different features. A trunnion valve can be offered with different bore arrangements, so specify both design questions independently.
What should I send KEHUA for a recommendation? Share the line datasheet, required opening, pigging requirement if any, pressure and temperature range, fluid details, materials, end connections and document scope. KEHUA can then review an appropriate project-specific ball valve proposal.
Compare valve families
Use this guide together with the relevant valve family and project operating data.